A121/CMC is intended for use on projects where a construction manager, in addition to serving as adviser to the owner, assumes financial responsibility for construction of the project. The construction manager provides the owner with a guaranteed maximum price proposal, which the owner may accept, reject or negotiate. Construction manager becomes contractually bound to provide labor and materials for the project. The document divides the construction manager's services into two phases: the preconstruction phase and the construction phase, portions of which may proceed concurrently in order to fast-track the process. A121/CMc is for use with A201-1997, General Conditions of the Contract for Construction, and B141-1997, Standard Form of Agreement Between Owner and Architect, 1991.
AIA Documents are Non-Returnable
Please note that in order to preserve document authenticity, AIA does not offer downloadable forms. Construction Book Express will ship original paper AIA documents only
AIA Contract Documents® and the content therein are copyrighted works owned by American Institute of Architects. AIA Contract Documents® are protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction, display or distribution of an AIA Contract Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. AIA Contract Documents® are licensed for one time use only and may not be reproduced prior to its completion.
AIA, The American Institute of Architects and the AIA emblem are registered trademarks owned by the American Institute of Architects.
|