Construction Book Express and our suppliers are dedicated to providing quality products to our customers. We stand behind our commitment to quality with a satisfaction guarantee on every purchase*. If, for any reason, a customer is not satisfied with a product, they may return it within 30 days of the date purchased for a refund of the purchase price of the product(s). Returned merchandise must be in its original box, in new condition and include all instructions, and the invoice or packing slip.
*Exceptions: Videos/DVDs, audiotapes and software products (once opened), forms, documents, reports and downloads are not returnable.
Fire testing and design criteria for aircraft loading walkways
Design and maintenance of the drainage system of an aircraft fueling ramp to control the flow of fuel that can be spilled on a ramp and minimize possible danger
Changes in the 2008 Standard include:
Revised requirements for interior finish in terminal buildings
Updated provisions for accelerated weathering criteria for flexible closures, canopies, wipers and weather-sealing devices
(Softbound, 19 pp., 2008)
NFPA 415: Standard on Airport Terminal Buildings, Fueling Ramp Drainage, and Loading Walkways, 2008 Edition