Construction Book Express and our suppliers are dedicated to providing quality products to our customers. We stand behind our commitment to quality with a satisfaction guarantee on every purchase*. If, for any reason, a customer is not satisfied with a product, they may return it within 30 days of the date purchased for a refund of the purchase price of the product(s). Returned merchandise must be in its original box, in new condition and include all instructions, and the invoice or packing slip.
*Exceptions: Videos/DVDs, audiotapes and software products (once opened), forms, documents, reports and downloads are not returnable.
Fire testing and design criteria for aircraft loading walkways
Design and maintenance of the drainage system of an aircraft fueling
ramp to control the flow of fuel that can be spilled on a ramp and
minimize possible danger
Approx. 19 pp.
NFPA 415, Standard on Airport Terminal Buildings, Fueling Ramp Drainage,
and Loading Walkways, 2002 edition - Table of Contents:
Administration
Referenced Publications
Definitions
Airport Terminal Buildings
Aircraft Fueling Ramp Drainage
Aircraft Loading Walkways
Annex A Explanatory Material
Annex B Building Construction Types
Annex C Glazing Materials
Annex D Informational References
Index
NFPA 415 - Standard on Airport Terminal Buildings, Fueling Ramp Drainage, and Loading Walkways, 2002 Edition