South Carolina Concrete Contractor
Sample Questions for the South Carolina Concrete Contractors Exam
-
Pipes or conduits made of _______ shall NOT be embedded in reinforced concrete unless coated to prevent electrolytic action.
- steel
- brass
- copper
- aluminum
-
The method of conveying concrete from the mixer shall:
- be as rapid as possible.
- be done with steel chutes.
- prevent separation and loss of materials.
- be started within 90 minutes of arrival at the jobsite.
-
Who shall the special inspector first notify when discrepancies are observed?
- The contractor.
- The building official.
- The testing laboratory.
- The architect or engineer of record.
-
Immediately before placing fresh concrete against previously placed (hardened) concrete at a construction joint, the surface of the hardened concrete shall be:
- dried.
- wetted and standing water removed.
- roughened.
- coated with a bonding agent.
-
The minimum inside diameter of bend for a No. 8 bar size, other than for stirrups and ties, is ______ bar diameters.
- 3
- 4
- 6
- 8
Answers: Click Here to show the answers.
1.) d 2.) c 3.) a 4.) b 5.) c