North Carolina Water Purification and Sewage Disposal
Sample Questions for the North Carolina Water Purification and Sewage Disposal Exam
-
Which of the following is considered a job related cost?
- Trade Association membership dues
- Contractor's license renewal fee
- Performance bonds
- Office rent
-
Generally a buffer zone is measured from the edge of the water to:
- The nearest edge of the disturbed area
- The furthest edge of the disturbed area
- the top of the bank
- the bottom of the bank
-
Liens may not be filed ¬no more than _____ after the last furnishing of labor or materials at the site of improvement:
- 7 days
- 30 days
- 90 days
- 120 days
-
Which of the following components should be used to attach the drain line from a reverse osmosis unit to the drain system?
- P-trap
- Saddle valve
- Angle stop
- Air gap
-
According to the North Carolina One Call a person planning to excavate must notify each utility owner having underground utilities located in the proposed area to be excavated not less than ___ nor more than ___ days prior to starting?
- 1 and 10
- 1 and 15
- 2 and 10
- 2 and 15
Answers: Click Here to show the answers.
1.) c 2.) a 3.) d 4.) d 5.)c