Missouri Plumbing Contractor
Sample Questions for the Missouri Plumbing Contractors Exam
-
What is the aim of municipal codes in relation to drainage systems?
- to show you how to size a building drain
- to protect the public health
- to explain what a waste stack is
- to give detailed instructions on calculating maximum fixture unit loads
-
When a vent is required in indirect waste piping, how must it be installed?
- connect it to a vent which serves a sanitary system
- to extend separately to the outside air
- with a beehive strainer at least 4 inches high
- below floor level
-
What are the two causes of fixture trap seal loss that vent systems protect against in normal fixture use?
- siphonage and back pressure
- sumps and receiving tanks
- suds-producing fixtures and appliances
- water closets and building drains
-
Which of the following implements should be used to prevent kinks when reshaping soft copper tubes?
- a dummy
- a brass ferrule
- a bending spring
- an internal switch
-
What fitting and procedure should be used to connect a discharge pipe from a sewage ejector to a horizontal gravity draining line?
- from top through a tapped san tee fitting
- from the side through a P-trap fitting
- from the top through a wye branch fitting
- from the bottom through a 1/8 bend fitting
Answers: Click Here to show the answers.
1.) b 2.) b 3.) a 4.) c 5.) c
