B2112007 requires that the architect develop a Commissioning Plan, a Design Intent Document, and Commissioning Specifications, based on the owner’s identification of systems to be commissioned. The architect will also be required to review the contractor’s submittals and other documentation related to the systems to be commissioned, observe and document performance tests, train operators, and prepare a Final Commissioning Report.
B2112007 is a scope of services document only and was revised in 2007 to align, as applicable, with B1012007. B2112007 may be used in two ways:
- attached to G8022007, Amendment to the Professional Services Agreement, to create a modification to an existing owner-architect agreement.
- incorporated into the owner-architect agreement as the architect’s sole scope of services or used with documents that also detail additional scopes of services
Please note that in order to preserve document authenticity, Construction Book Express does not offer downloadable AIA forms. Construction Book Express will ship original paper AIA documents only.
AIA Contract Documents® and the content therein are copyrighted works owned by American Institute of Architects. AIA Contract Documents® are protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction, display or distribution of an AIA Contract Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. AIA Contract Documents® are licensed for one time use only and may not be reproduced prior to its completion.
AIA, The American Institute of Architects and the AIA emblem are registered trademarks owned by the American Institute of Architects.
Note: AIA Documents are Non-Returnable